To get the best results from Aqua Fend® it is important to follow the instructions below.
SUBSTRATE PREPERATION
Substrates must always be clean, dust-free, and dry.
APPLICATION
Read product information sheet prior to commencing application. This can be downloaded on the Aqua Fend F and Aqua Fend G product pages.
Remember to wear appropriate PPE (including gloves, mask/respirator, tyvek suit, and eye wear) during application
- Use the product directly from the container. Shake the container well, before use
- On application, always apply from bottom up
- Always test out the product on a small hidden portion of the substrate
- Ideally apply using a High-Volume, Low-Pressure sprayer
- The substrate must be impregnated to the point of saturation in a single application process (wet-on-wet)
- Do not over-apply the product
- Water repellence achieved within 24 hours
- Optimum effectiveness obtained after 7 days
- Clean equipment with water
NEED ASSISTANCE?
Get in touch with us using our contact form, or call us on +44(0)208 4531494.